Meriva Shores

Beachfront apartments by Ellington on Dubai Islands, with direct access to the shoreline.

Meriva Shores
Meriva Shores is a beachfront residential development by Ellington Properties on Dubai Islands, offering contemporary apartments within The Meriva Collection.
Location
Dubai Islands, Dubai
Price
AED 3,160,000+
Unit types
Apartments
Bedrooms
1 to 3
Developer
Ellington Group
Completion date
Q2 2030

About Meriva Shores

Meriva Shores is a beachfront residential development by Ellington Properties on Dubai Islands, forming part of The Meriva Collection. The wider destination brings together residential buildings, a signature beachfront residence, and a dedicated hotel, with the shoreline...

Amenities

  • BBQ area
  • Children swimming pool
  • Dining area
  • EV charging station
  • Gymnasium
  • Padel court
  • Parking
  • Swimming pool
  • Video security
Meriva Shores is located in

Dubai Islands

Dubai Islands is one of Dubai's most ambitious destinations for luxury off-plan property, offering an exceptional collection of beachfront apartments, branded residences, waterfront villas and resort-inspired communities across five interconnected islands. Developed by Nakheel, the master plan...

Learn more

Payment plan

  • 20%
    Installment 1 On booking
  • 50%
    Installment 2 During construction
  • 30%
    Installment 3 On handover

Ellington Group

This group was founded in 2014. It aims to craft beautiful environments for exceptionally high-quality lifestyles. Artistically inspired reflecting their owner’s aspirations, Ellington residences are classic in feel but display a contemporary vision that highlights the exuberance of life. Their...

Browse other developments by Ellington Group

FAQs about Meriva Shores

  • Meriva Shores is located in The Meriva Collection, Dubai Islands, Dubai.
  • The developer of Meriva Shores is Ellington Group.

    This group was founded in 2014

  • The development offers apartments and ranging from 1 to 3 bedrooms.
  • Units in Meriva Shores start from AED 3,160,000.
  • Meriva Shores is expected to be completed by Q2 2030.
  • A structured 20/50/30 payment plan is offered.